Construction Process Simulation and Safety Analysis Based on Building Information Model and 4D TechnologyConstruction Process Simulation and Safety Analysis Based on Building Information Model and 4D Technology
胡振中;张建平;邓资银;
摘要(Abstract):
Time-dependent structure analysis theory has been proved to be more accurate and reliable compared to commonly used methods during construction. However, so far applications are limited to partial period and part of the structure because of immeasurable artificial intervention. Based on the building informa-tion model (BIM) and four-dimensional (4D) technology, this paper proposes an improves structure analysis method, which can generate structural geometry, resistance model, and loading conditions automatically by a close interlink of the schedule information, architectural model, and material properties. The method was applied to a safety analysis during a continuous and dynamic simulation of the entire construction process. The results show that the organic combination of the BIM, 4D technology, construction simulation, and safety analysis of time-dependent structures is feasible and practical. This research also lays a foundation for further researches on building lifecycle management by combining architectural design, structure analysis, and construction management.
关键词(KeyWords):
基金项目(Foundation): the National Natural Science Foundation of China (No. 50478015) ;; the National Technological Support Program for the 11th Five-Year Plan of China (No. 2006BAJ10B07)
作者(Authors): 胡振中;张建平;邓资银;
参考文献(References):
- [1]Charles M E.Building Product Models:Computer Envi-ronments Supporting Design and Construction.Washing-ton D.C.,USA:CRC Press,1999.
- [2]Hu Z Z,Zhang J P,Lu M,et al.Simulation and optimiza-tion of prefabricated steel-structure installation operations.In:Proceedings of1st International Construction Specialty Conference.Calgary,Canada,2006.
- [3]Koo B,Fischer M.Feasibility study of4D CAD in com-mercial construction.Construction Engineering and Man-agement,2000,126(4):251-260.
- [4]Calvin K,Martin F,Reijo H,et al.The product model and fourth dimension project.ITcon,2003,8(Special Issue):137-166.
- [5]Adjei-Kumi T,Retik A.A library-based4D visualization of construction processes.In:Proceedings of the InternationalConference on Information Visualization.London,Eng-land,1997.
- [6]Rad H N,Khosrowshahi F.Visualization of building main-tenance through time.In:Proceedings of the International Conference on Information Visualization.London,Eng-land,1997.
- [7]Zhang Jianping,Cao Ming,Zhang Yang.A4D construc-tion management system based on IFC standard and engi-neering information model.Engineering Mechanics,2005,22(suppl.):220-227.(in Chinese)
- [8]Liu Xila.The Status and Prospects of Structural Enginee-ing.Beijing,China:China Communication Press,1997.(in Chinese)
- [9]Zuo Zhiyong,Liu Xila.Fully stochastic analysis method for structural dynamic reliability.Journal of Tsinghua Uni-versity(Science and Technology),2004,44(3):395-397.(in Chinese)
- [10]Wang Jian.Performance prediction and reliability man-agement of concrete structures based on information updating[Dissertation].Beijing:Tsinghua University,2006.(in Chinese)
- [11]Mori Y,Ellingwood B R.Reliability-based service-life as-sessment of aging concrete structures.Structural Engineer-ing,1993,119(5):1600-1621.
- [12]Lee K,Chin S,Kim J.A core system for design informa-tion management using industry foundation classes.Com-puter-Aided Civil and Infrastructure Engineering,2003,18:286-298.
- [13]Fu Changfeng,Aouad G,Lee A,et al.IFC model viewer to support nD model application.Automation in Construction,2006,15:178-185.
- [14]Chen Po-Han,Cui Lu,Wan Caiyun,et al.Implementation of IFC-based web server for collaborative building design between architects and structural engineers.Automation in Construction,2005,14:115-128.
- [15]Zhang J P,Liu L H,Coble R J.Hybrid intelligence utiliza-tion for construction site layout.Automation in Construc-tion,2002,11(5):511-519.